2026 Road Projects Anticipated

Forty Dollar Road – project will be completely graded and all ditches will be cleaned in July 2026. Blacktop installation will begin at the Campbell Town line and continue two tenths of a mile past Tanglewood Lake entrance in October 2026.

Eddy Road – project is on-going with ditching and replacing driveway culverts as needed. The road will be graded with new gravel and blacktop will be installed in October 2026.

Tucker Road – project will start at Starr Road and run to McIntosh Road four corners. Oil and stone will be taken up with new gravel installed. Blacktop will be installed the summer of 2027. Ditches from Starr Road to County Route 333 will be cleaned for the 2028 blacktop project.

All town pothole areas have been graded. All shoulders will be cut and ditches cleaned as time allows.